How it works

From address to buildable plan in four steps.

Parcy runs the same workflow a development studio runs on a new site. It just does it in seconds, on your phone, for any parcel in California.

1

Enter an address

Parcy geocodes the address, pulls the parcel boundary from county records, reads the zoning designation, and detects the existing building footprint from satellite and GIS data. Fire severity zones, flood overlays, and setbacks are layered on automatically.

Find ADU potential

See what you can build on any residential property.

1428 Maple AveTorrance, CA 90503
1428 Maple StSanta Monica, CA 90405
1428 Maple DrOakland, CA 94603
Property type defaults to Single-Family
Single-Family
Multifamily (2+)
Number of ADUs
1 default2 AB 956
Maximize value
Analyze property
2

See ADU potential

The engine applies California ADU law first (state ADU statutes, SB 1211 for multifamily lots, JADU rules) and then the local overlay. It tells you how many detached, attached, or converted ADUs you can add, where they fit, and that approval is ministerial with a 60-day clock. Additional housing pathways like SB 9 and SB 684 are coming to the engine soon.

Snapshot
Analyzing property
1428 Maple Ave, Torrance, CA 90503
Locating parcel
Mapping existing structures
Calculating buildable area
Running ADU placement
Estimating value & rent
1428 Maple AveTorrance, CA 90503
Feasible on your lot
See your ADU layout
Projected returns2 ADU proposal
Value added$529kadded to your property
Build cost$312kone-time
ADU rent / mo$3.1k$37k per year
Return on cost70%value per $ spent
Summary
Units & Layout
Edit ADUs
3

Add it. Resize it. Watch the numbers move.

Drag ADUs anywhere in the buildable area, resize them, change the unit count, bedrooms, stories, and finish level. Every edit recalculates build cost, rent, value added, and return on cost from local comps and local construction pricing, so the number on screen is specific to your lot, not a statewide average.

ADU 11 Bed / 1 Bath600 ft²
ADU 2Studio400 ft²
20.0' × 20.0'
4.0 ft
Done
ADU 02400 ft²
Stories1 Story2 Story
Unit typeStudio
FinishEconomy
Value added$529k+$56k
−
Build cost$312k+$31k
=
Gross profit$217k+$25k
Total rent / mo$3.1k
ROI70%
Live estimate · updates as you edit
4

Save it. Compare it. Share it.

Save scenarios, stack up to five properties side by side, and export a PDF you can hand to a lender, a partner, or an architect as first-pass underwriting. If the numbers work, the group behind Parcy can take it from there: design, entitlements, construction, and lease-up, handled end to end.

1428 Maple AveTorrance, CA 90503
Proposed units+ Add ADU
01
1BR · Detached 1bd 1ba600 ft² · est. $1,700/mo · Low finish
02
1BR · Detached 1bd 1ba880 ft² · est. $1,700/mo · Low finish
Save this scenario
Saved scenarios1 saved
Saved as "Scenario 2"
Save scenario
NAME
Scenario 2
2 ADUs · 1,480 ft²
ADU 1 · 1bd/1ba · 20×30 ft · 600 sqft · 1 story$1.7k/mo
ADU 2 · 1bd/1ba · 27×32 ft · 880 sqft · 1 story$1.7k/mo
Total rent / mo$3.4k
Value added$585k
−Build cost$343k
=Gross profit$242k
ROI71%
Cancel
Save
CompareExport PDF
Scenarios comparedUp to 5 at a time
2
METRIC
Scenario 11428 Maple Ave
Scenario 21428 Maple Ave
RETURNS
Gross profit$160k$242k
Value addedfrom ADUs only$300k$585k
Build costADUs only$140k$343k
ADU rent / mofrom ADUs$1.7k$3.4k
ROIprofit ÷ cost114%71%
Share scenario comparison
Parcy-compare.pdfAirDropMailSave to Files
Questions

What people ask before they run an address.

Which properties does Parcy support?

Any residentially zoned parcel in California, single-family or multifamily. Coverage is deepest in Los Angeles County, Orange County, and the Bay Area, where county GIS services expose zoning and overlays directly.

How accurate are the numbers?

Rents come from live comps near the lot. Build costs are local per-square-foot figures by ADU type. Valuations use the method a lender would use at that unit count. Everything is an estimate meant to tell you whether a project is worth pursuing, and should be verified by a licensed architect and your local planning department before you build.

Does Parcy handle SB 9 lot splits or SB 684 subdivisions?

Not yet. Parcy launches with California ADU law only: detached, attached, and converted ADUs, JADUs, and the SB 1211 rules for multifamily lots. SB 9, SB 684, SB 1123, SB 79, and density bonus analysis are on the roadmap. Read about each on the ADU law index.

How many ADUs can I build?

On a single-family lot, state law allows one ADU plus one JADU. On a multifamily lot, SB 1211 allows detached ADUs up to the number of existing units, capped at eight, plus converted-space ADUs up to 25% of the existing unit count.

Can I just run the address and hire my own contractor?

Yes. Parcy is a tool first. The consult and build service is there if you want the team that built the tool to handle the project.

Ready to run your address?

Book a consult →