California ADU law index

Every California ADU and housing bill, in one place.

A running index of the Senate and Assembly bills that decide what a California lot can hold: ADU statutes, SB 1211, JADU rules, the 2026 process reforms, and the pathways coming to Parcy next. Updated as bills take effect.

Updated November 2026Maintained by the Parcy development team

Stay ahead of the next ADU bill.

New California housing bills, what they mean for your lot, and news from Parcy and Kaz Capital Group. A few emails a month.

By subscribing you agree to receive email from Parcy and Kaz Capital Group — bill updates, guides, and other news from us. Unsubscribe anytime. Privacy.

A single-family lot split by a glowing line, with a duplex projected as a hologram on each half
SB 92021

Urban lot splits and duplexes on single-family lots, ministerially. Up to four homes where one stood.

Ten small homes projected as holograms along a shared driveway on a multifamily lot
SB 6842023 · effective Jul 1, 2024

Ministerial small-lot subdivisions of up to ten homes on multifamily-zoned lots under five acres.

Ten small cottages projected as holograms on a vacant single-family lot
SB 11232024 · effective Jul 1, 2025

Extends SB 684 to vacant single-family lots.

Eight detached ADU cottages projected as holograms behind a two-story apartment building
SB 12112024 · effective Jan 1, 2025

Up to eight detached ADUs on multifamily lots (one per existing unit), converted-space ADUs up to 25% of existing units, and no replacement parking for removed uncovered spaces.

A ranch house with one backyard ADU and a junior unit in the garage projected as holograms
ADU statutesGov. Code § 66310 et seq.

The state ADU law, renumbered from § 65852.2 in 2024. One ADU and one JADU by right on single-family lots; 800 sq ft exemption; 4 ft setbacks; 60-day ministerial approval; no owner-occupancy.

Cutaway of a home with a junior unit and its kitchenette projected as a hologram in one wing
JADU rulesGov. Code § 66333 et seq.

Junior ADUs up to 500 sq ft inside the home, efficiency kitchen, shared bathroom allowed. AB 1154 (2026) limits owner-occupancy to shared-bath JADUs.

A backyard ADU projected as a hologram with glowing dimension lines around its walls
SB 5432025 · effective Jan 1, 2026

15-business-day completeness review with a deemed-complete rule, 800 sq ft measured as interior space, school fee exemption for units under 500 sq ft.

Cutaway of a home showing a junior unit sharing one bathroom with the main house
AB 11542025 · effective Jan 1, 2026

JADU owner-occupancy required only when the JADU shares a bathroom with the primary home.

A coastal bluff home with a detached ADU projected as a hologram beside it
AB 4622025 · effective Oct 15, 2025

60-day coastal development permits for ADUs in the Coastal Zone; detached ADU occupancy before the main home is rebuilt in disaster counties.

A backyard ADU projected as a hologram with a glowing key floating above it
AB 9762023 · effective Jan 1, 2025

Permanently prohibits owner-occupancy requirements for ADUs.

An ADU rising as a hologram from a stack of pre-approved plan sheets on a drafting table
AB 13322023 · effective Jan 1, 2025

Requires every city and county to publish pre-approved ADU plans and act on applications using them within 30 days.

A lot beside a light-rail station where an ADU hologram replaces a parking space
AB 20972022

No minimum parking requirements for residential projects, ADUs included, within a half mile of major transit.

An older converted garage unit traced by a glowing hologram outline, as if being approved
AB 25332024 · effective Jan 1, 2025

Amnesty path to legalize ADUs and JADUs built before Jan 1, 2020; cities may deny only on health and safety grounds; fees waived.

A backyard cottage on its own glowing parcel line, separate from the main house
AB 10332023

Cities may allow ADUs to be sold separately from the main home as condominiums.

A ranch house with a detached and an attached ADU as holograms and glowing setback lines along the fence
SB 13 / AB 68 / AB 8812019 · effective Jan 1, 2020

The 2020 ADU reform package: 60-day approvals, impact fee exemption under 750 sq ft, 4 ft setbacks, 800 sq ft exemption, two ADUs on multifamily lots, five-year owner-occupancy moratorium.

A two-story detached ADU hologram rising above the backyard fence of a one-story home
SB 897 / AB 22212022

Raised ADU height limits to 18 ft near transit and on multifamily lots, 25 ft for attached ADUs; front setbacks cannot block the 800 sq ft unit; detached ADU allowed with a proposed home.

A seven-story apartment building projected as a hologram beside a light-rail station on a street of small homes
SB 792025 · effective Jul 1, 2026

Transit-oriented upzoning: state-set heights and densities within a half mile of major transit stops in the largest counties.

A five-story infill apartment building projected as a hologram on an empty lot between existing buildings
AB 130 / SB 1312025

CEQA exemption for qualifying infill housing projects, with SB 158 setting a 30-day final action deadline and a four-acre threshold.

Extra floors projected as a hologram on top of an apartment building under construction in Los Angeles
Density Bonus LawGov. Code § 65915

Extra units, height, and reduced parking in exchange for affordable set-asides; the basis for Los Angeles ED1 100% affordable projects.

This index is informational and summarizes state law as we read it. Local ordinances add standards on top. Verify with your city's planning department and a licensed architect before relying on any provision.